• LATAM, Chile
  • 185 MW Onshore Wind
  • In Construction
  • Developed & constructed by:

    Mainstream Renewable Power

  • Total MW

    185

  • Technology supplier:

    Vestas

  • Commercial operation date:

    2021

Overview

Cerro Tigre wind farm (185 MW), located in the Antofagasta Region, forms part of the Cóndor portfolio within Mainstream's wholly owned Andes Renovables 1.3 GW platform.  When operational, the Cóndor portfolio will supply 680,000 Chilean homes.

Substantial progress is being made on site and roads have been laid and groundwork preparations are continuing for its eventual 44 wind turbines. 

The Andes Renovables platform was formed following Mainstream's win in the 2016 technology-neutral electricity auction. Mainstream was the biggest winner in Chile’s taking 28% of the total allocated capacity and awarded a 20-year index-linked, US dollar denominated contract, to supply 3,366 gigawatt hours of firm power starting in 2021.

View our projects